New Integraal Kind Centrum (IKC) site in Lekkum
The school building of De Professor Wassenberghskoalle in Lekkum is too small. A new school building will therefore be built in a new location. The aim is to start using the new school from early 2026.
The study into a suitable location
Consultancy firm ICS Advisors looked into the most suitable location. This was commissioned by the City of Leeuwarden. Consideration was given, for example, to how the IKC fits into the landscape, traffic safety and the impact on the surrounding area and local residents. This study identified the grassland next to the handball field in Lekkum as the most suitable location. Since this land does not belong to the local authority, we must first buy it from the owner. The local authority and the owner are in negotiation on this subject.
Proloog is the building company
Together, the local authority and Proloog have decided that Proloog will be the builder and principal for the construction of the IKC. And the schoolyard/grounds that go with it. The local authority remains responsible for the necessary infrastructure modifications. This includes accessibility, parking and picking up and dropping off children.
Residents have their say
Residents of De Buorren will be involved at an early stage, if the land purchase goes ahead. They will then live opposite the new school building. We are happy to discuss and review with them some concrete options for the new IKC. This includes aspects such as the layout of the square, the placement of the building, traffic or parking. Residents living in the immediate vicinity of the new building will also be enabled to contribute to the design.
Interim solution
The school has been short of space for many years. And some of the pupils are having to be taught in the village hall. The situation is becoming increasingly urgent. A temporary solution for additional spaces is therefore being considered.
The study into a suitable location
Consultancy firm ICS Advisors looked into the most suitable location. This was commissioned by the City of Leeuwarden. Consideration was given, for example, to how the IKC fits into the landscape, traffic safety and the impact on the surrounding area and local residents. This study identified the grassland next to the handball field in Lekkum as the most suitable location. Since this land does not belong to the local authority, we must first buy it from the owner. The local authority and the owner are in negotiation on this subject.
Proloog is the building company
Together, the local authority and Proloog have decided that Proloog will be the builder and principal for the construction of the IKC. And the schoolyard/grounds that go with it. The local authority remains responsible for the necessary infrastructure modifications. This includes accessibility, parking and picking up and dropping off children.
Residents have their say
Residents of De Buorren will be involved at an early stage, if the land purchase goes ahead. They will then live opposite the new school building. We are happy to discuss and review with them some concrete options for the new IKC. This includes aspects such as the layout of the square, the placement of the building, traffic or parking. Residents living in the immediate vicinity of the new building will also be enabled to contribute to the design.
Interim solution
The school has been short of space for many years. And some of the pupils are having to be taught in the village hall. The situation is becoming increasingly urgent. A temporary solution for additional spaces is therefore being considered.