Quick to:

What are the rules?

To excavate, move or use soil, dredging spoil and building materials, you must comply with the rules of:

How does it work?

If you want to excavate, move or use soil, building materials and/or dredged material within the municipality, please report this via DSO 5 days before the work.

When not to submit a report?

  • The use of a maximum of 25m3 of soil or dredged material as a private individual (by a natural person).
  • If the soil or dredging spoil is used from the same farm on the same plot.
  • The use of up to 50 m3 of soil or dredging spoil that complies with the background value (clean soil, usable for multiple functions).
  • Maximum 50m3 of land, quality agriculture/nature.

Laws and regulations

The following laws can be found on the website Overheid.nl (national):

  • Environment and Planning Act
  • Environmental Management Act
  • The Soil Quality Decree

The following regulations can be found on the website Overheid.nl (local):

  • Soil Protection Act
  • The Soil Management Policy Leeuwarden